Share with a friend

Copy link to article

Copied!

Nordgold Equips West Africa Training Centre with the Full-Mission Simulator System

London, United Kingdom, 5 November 2020 — Nordgold, the internationally diversified gold producer, has equipped its new West Africa Training Centre, located near the Lefa mine in Guinea, with a CYBERMINE Full-Mission Simulator. The simulator is a training tool for mining fleet operators designed to improve their skills in safe and efficient manipulation of modern mining equipment.

The West Africa Training Centre, launched earlier this year, will further the development of technical skills of Nordgold’s 1,300-strong workforce based in the region.

The Full-Mission Simulator has been developed by ThoroughTec Simulation, a company with over 25 years’ experience in technology-based training solutions. The Simulator will include a learning platform and Surface Excavator Simulator Cab (based on a Cat 6020B).

The CYBERMINE Full-Mission Simulator is a high-fidelity system that creates the realistic sensation of driving the real vehicle in an actual mine, with all the correct visual, auditory and tactile feedback. Instructors will be able to configure training scenarios to specific work situations faced on the individual mine site. The simulator cab uses actual OEM controls and the simulated vehicle dynamics are based on detailed mathematical models that use vehicle manufacturer specifications to provide the most realistic training experience possible.

The centre’s facilities will also include a maintenance workshop covering 24 different types of equipment (engines, brake systems, etc.) and a welding section. These facilities will enable the whole workforce to further improve their skill sets which are unique to their individual roles. Training will also be provided to the local communities.

Nordgold expects the total investment, including the construction of the centre and the purchase of the equipment, to cost approximately US $800,000. The investment in this high tech simulator follows a major investment programme across its West African operations in both Burkina Faso and Guinea in 2019, installing high end equipment and implementing extensive training systems to ensure its operations were as efficient, safe and environmentally sustainable as possible.

“West Africa, which now accounts for half our total group production, is a key region for Nordgold. We remain committed to further developing our operations in the region. So investing in our people and their skills development is vital to our future success. These simulation tools are an important part of our wider training programme into which we have invested significantly over the past two years. They will enhance the skills of our people, and in turn will enable us to run safer, more efficient operations. The West Africa Training Centre in Guinea is an important element of our strategic Employee Development Programme. Our people are our key asset and it is important we continue to invest in them.” Yulia Sklar Human Resources Director of Nordgold

About Nordgold

Nordgold is an internationally diversified one million ounce gold producer with over 8,000 people operating a portfolio of ten mines (in Burkina Faso, Guinea, Russia and Kazakhstan) and a number of development and exploration projects in West Africa, Eurasia and the Americas. Since its foundation in 2007, Nordgold has established a global reputation as a leading developer of tier one gold mining assets with a proven commitment to community engagement, sustainability, efficiency and operating in an environmentally responsible manner. Since 2013, Nordgold has successfully constructed three gold mines, including two in Burkina Faso (Bouly and Bissa) and most recently, the Gross mine in Russia.

Enquiries

Nordgold
Olga Ulyeva
Head of Corporate Communications
olga.ulyeva@nordgold.com

Powerscourt
Peter Ogden
Tel: +44 (0) 20 7250 1446

Apply for a job

work Format Contact information Professional data

Select the work format

Enter your personal information

Enter your contact information

Please enter professional data

Attach your resume

Drag and drop a file here or

select file Acceptable file format:. pdf,. doc,. docx,. rtf
Acceptable file format:. pdf,. doc,. docx,. rtf

Thank you! Your request was successfully submitted

Our recruiter will process the application
and contact you soon

Resume
close

Thank you! Your message has been sent

Application form

Dear candidate,
We are happy to welcome you as a participant of The Fast Track program selection process. Please fill in the application form below. Please ensure that the content of application form is accurate before submitting. Please carefully save the form and be aware it was submitted by the first time. Unfortunately you couldn't save the form and return for it's editing later. We wish you good luck during the selection process and will be happy to see you in Nordgold.

Photo upload

Contact information

Career disciplines*

Currently the applications flow is open for all 4 career disciplines. Please choose one of them if your professional specialization is relevant

Relocation possibilities*

Languages*

Work experience*

Add new

Upload attachment*

Resume/CV*

Upload resume

Cover letter*

Dear candidate,
You are welcome to leave a cover letter. Among the other things, you may answer the following questions: Why do you want to work at Nordgold? And why are you our best choice for this program?

Upload letter

Additional information

Add new

I've gained the information regarding the Fast Track program from (choose one of the answers or propose yours):